ESD(Energy Saving Device)
Installation Method
â– Precautions for Equipment Installation
​
-
Verify that the Main circuit breaker is tripped and make sure it is tripped.
â– Process
​
-
Open the Main panel board.
​
-
Turn off the Main breaker and check the voltage on the secondary side of the Main breaker with an instrument.
​​
-
Find a suitable location inside the Main panel board where the product can safely fit and insert it.
​​​
Primary side
Phase N
Switch(S/W)
-
​Loosen the bolts or nuts on the secondary side of the Main breaker, and connect the Product's cable terminals to the secondary side of the Main breaker on each phase.
​​
-
Tie the cables together with cable ties after organizing them well with the existing cables.
​​
-
Turn on the Main breaker and verify that all equipment is working properly.
Secondary side
â– FORCE Installation â…
​
-
Always consult a qualified electrician before doing any electrical work.
​​
-
It should not be interpreted as instructions or procedures for FORCE installation or electrical panel work.
​
-
Components : FORCE, 2 – Terminal Y(White), 2 – Plug-in Terminal(Yellow), 2 – Cable, 2 – Rubber ring, 2 – Cab, 4-1 inch Screw(Y and Plug-in Terminal are connected to Cable)
​​
-
Find the Main breaker first, then turn off the Main breaker, and then turn off all breakers. (Before removing the panel cover, use an instrument to double-check that the power is off.)
​
-
After verifying that the power is off, remove the panel cover carefully. Insert the rubber ring(Narrow side facing terminal Y) through the plug-in terminal and connect the plug-in terminal to FORCE until it clicks.
​
-
Place the cap on the Y-shaped terminal, bring it to the device, and close it. (Twist it) Make sure the plug-in terminal is fully connected to the FORCE and seal it with the cap.
​
-
Install FORCE anywhere within 1 meter (39 inches) of the panel.
​
-
After loosening bolts or nuts attached to the Bus-Bar, connect one Y-terminal(white) to the left side of the Bus-Bar and tighten the bolts and nuts securely. Then connect the other Y terminal to the right side of the Bus-Bar as procedure #2-4.
​
-
Install the panel cover to the back.
​
-
Turn on the Main breaker to complete the installation.
â– FORCE Installation â…¡
​
-
Always consult a qualified electrician before doing any electrical work.
​​
-
It should not be interpreted as instructions or procedures for FORCE installation or electrical panel work.
​
-
Components : FORCE, 2 – Terminal Y(White), 2 – Plug-in Terminal(Yellow), 2 – Cable, 2 – Rubber ring, 2 – Cab, 4-1 inch Screw (Y and Plug-in Terminal are connected to Cable)
​
-
Find the Main breaker first, then turn off the Main breaker, and then turn off all breakers. (Before removing the panel cover, use an instrument to double-check that the power is off.)
​
-
After verifying that the power is off, remove the panel cover carefully. Insert the rubber ring (Narrow side facing terminal Y) through the plug-in terminal and connect the plug-in terminal to FORCE until it clicks.
​
-
Place the cap on the Y-shaped terminal, bring it to the device, and close it. (Twist it) Make sure the plug-in terminal is fully connected to the FORCE and seal it with the cap.
​
-
Install FORCE anywhere within 1 meter (39 inches) of the panel.
​
-
Cut off the terminal Y on the cable, and peel off about 12 inches of the end of the cable cover. (Cover only)
​
-
Connect the cable to the switch.
​
-
On one or both sides of the panel, remove two switches shown in the first part, as shown in the figure.
​
-
Connect both FORCE-attached switches with the two top breakers in the first part of the selected panel.
​
-
Install a FORCE switch on the selected panel and turn on the switch only! (Not the main breaker)
​
-
Install the panel cover to the back Safely.
​
-
Turn on the Main breaker to complete the installation.
​